EC-Banner-R_opt
IMG-20190225-WA0021_opt
IMG-20190226-WA0041_opt

Memorandum of Agreement signed on 25th February 2019 for the development and commercial operation of 1 x 6.0MW (Baseload) Mixed Fuel Fired Biomass Distributed Generation Facility with provision for supply of power between Samar II Electric Cooperative, Inc (SAMELCO II) and T.S. Renewable Energy Solutions Pte Ltd.