Keningau, Sabah, East Malaysia
Fuel: Woodwaste 
Capacity: 6.0 MW, 50tons/hr boiler @37 bar(g), 435oC with step grate

Plant Location
Keningau, Sabah, East Malaysia

Biomass Fuel
Woodwaste

Plant Capacity
6.0 MW, 50 tons/hr boiler @37 bar(g), 435°C with step grate